ICT has established three levels of service offerings, which
meet a large percentage of our customer's requests. These
package solutions make it more cost effective with a defined
set of services required to meet each level of objective.
Plant Network Assessment
PNA Plan is geared for the small to medium sized client who
wants a basic evaluation and assessment of their plant network.
Assessment will include identification of current communication
structures and connected equipment. The report summary will
point out areas of concern and targets for future improvements.
PNA Plan includes the following functions:
On-site one-day walk through
Network Baselining and Network Evaluation
o Physical Infrastructure evaluation
o Hardware Assessment
o Traffic Patterns
o Peak and Average Network Utilization
o Protocol Usage
o Recommendations
Send email to request scheduling
and pricing
Enhanced Network Evaluation
ENE Plan is geared for the medium to larger network clients
or companies who have serious concerns about performance and/or
is considering an infrastructure or network architecture change.
This can be performed as a follow on to a PNA Plan or performed
initially. The ENE plan covers a greater amount of detailed
analysis and a more complete on site evaluation. This service
is intended to provide a detailed as-is document with a recommended
Network design. Plan II includes the following functions:
· All Plan I functions (walk through may be several
days)
· Detailed analysis of high traffic devices
· Design Recommendations
· Detailed Network design
Send email to request scheduling
and pricing
Advanced Networking Analysis & Design
ANAD Plan is an extensive program aimed at providing a specific
and detailed plan to meet your company objectives and budget.
Built on previous plans or started directly, the ANAD plan
will yield a roadmap and design layout that is specifically
tailored to your requirements. This plan goes beyond a technical
/ physical design and incorporates input from various departments
within the company. Discussions with several of the automation
vendors will allow a design that integrates the existing and
future equipment destined for the shop floor.
· All functions of Plan I and Plan II
· Review of Implementation Plan with key personnel
· Hardware review
· Costing and deployment analysis and planning
· Implementation Assistance
Send email to request scheduling